8 | S P A C E S A common misconception in the renovation process is the planning and design time required before demolition can even begin. Every project is unique, and the scope of work will determine the amount of prep time required. For a typical kitchen reno, allow a minimum of 12 months prior to construction. A year of planning can sound like a long time, especially when you are excited to start your project. However, good planning and preparation can save both time and money during the construction phase. Home Renovations – Part One: Planning HOME RENOVATIONS PART ONE: THE PLANNING STAGE Plan, plan, plan and plan some more. BEFORE CONSTRUCTION STARTS, THERE ARE FOUR MAIN AREAS THAT REQUIRE OUTLINING: PROJECT SCOPE OF WORK, BUDGET, DESIGN AND PROJECT TEAM. Follow Studio One Eleven's reno in the next edition